Incident severity levels: a simple SEV1 to SEV4 scheme for small teams

How to define incident severity levels by customer impact, decide who gets paged and what you post publicly, and keep the scheme small enough to use at 3 a.m.

· 6 min read · By the Spot Downtime team

When something breaks, the first question is how bad it is. Without agreed levels, every incident starts with an argument: should we wake someone up, tell customers, call the founder? Severity levels turn that argument into a lookup. Pick the level, and the response follows.

Large companies have elaborate schemes. A small team needs something it can remember half asleep. This post gives a four-level scheme, the rules for choosing a level, and what should be attached to each one.

Define severity by customer impact

The most common mistake is defining levels by technical cause: “database down is SEV1”. A database can be down with no customer impact (a replica), and a tiny bug can block every checkout. Define levels by what customers experience and how many of them are affected.

LevelCustomer impactExamples
SEV1Core service unavailable or data at risk, for most customersSite or API down, login failing for everyone, data loss or exposure
SEV2Major feature broken or serious degradation for many customersPayments failing for one provider, very slow responses, one region down
SEV3Minor feature broken or problem for a few customers, with a workaroundExports failing, a webhook delayed, one customer affected
SEV4Cosmetic or low-impact issue, no urgencyTypos, a broken link in docs, a non-critical admin page

Attach a response to each level

A level without a response is a label. Write down, for each level, four things: who is notified, how fast someone must respond, whether customers are told, and whether a review is held afterwards.

  • SEV1: page the on-call person immediately, any hour. Post on the status page within minutes. Update at a fixed rhythm until resolved. Hold a review afterwards.
  • SEV2: page the on-call person, any hour, if it is still happening. Post on the status page. Review if it lasted long or repeated.
  • SEV3: notify during working hours through chat or email. Fix in the normal flow of work. Tell the affected customers directly.
  • SEV4: file a ticket. No notification.

The numbers you attach (respond within 5 minutes, update every 30) are yours to choose. Choose ones you can keep. A promise a three-person team cannot meet is worse than a slower, honest one.

Rules for choosing a level

  • When unsure, go one level higher. You can downgrade in ten minutes once you know more. You cannot get back the hour you lost by under-reacting.
  • Anyone can declare an incident. The person who notices should not need permission to raise the level.
  • The level can change. A SEV2 that turns out to affect everyone becomes a SEV1. Record when and why it changed.
  • Severity is not priority. Severity describes impact now. How soon something gets fixed may also depend on effort and risk. Keep the two apart or the levels lose meaning.

Connect levels to your monitoring and alerts

The scheme only works if detection matches it. Make the monitors that guard your core paths, such as login, checkout and the main API, alert in a way that can wake someone, and send lower-stakes monitors somewhere quieter. If every alert pages a person at night, people stop trusting the pager. See how to cut false alarms and alert escalation policies for how to route them.

In Spot Downtime you can send alerts to different channels, such as Slack, PagerDuty, SMS or a phone call, so that a failure of the production API reaches a different place than a failure of an internal tool. A confirmed failure opens an incident in the incident history automatically, with its duration and reason, which is a useful starting record for a review.

Tell customers at the right levels

Decide in advance when the status page gets an update. A reasonable default is SEV1 and SEV2 always, SEV3 only when several customers are affected, SEV4 never. Writing the first message is easier with templates: see how to write incident updates customers trust and status page best practices.

Review after the incident

After SEV1s, and any incident that repeated, write a short blameless review: what happened, how it was detected, how long each stage took and what changes. Use the post-incident review template. Check afterwards whether the level you chose at the start was right. If you often had to raise it, your definitions are too optimistic.

Keep it small

Four levels, one table, one page. If the scheme does not fit on a single screen, nobody will use it during an outage. Put the table where the on-call person will find it, such as the top of your runbook.

Get new guides by email

Practical posts on monitoring, outages, error fixes and on-call, when they're published. No spam.

Unsubscribe from any email with one click. See our privacy policy.

Keep reading